Roads/Bridges/Viaducts

THIRD MILLENIUM BRIDGE along Sucharskiego Road in Gdansk
Klient
  • Client: DEMATHIEU & BARD S.A.
  • Scope of work: Partial works
Location
  • Voivodship: Pomorskie
Information
  • Contract duration: II/2000 - XII/2000

The bridge rests on an assymetrically situated pylon in the shape of an inverted letter Y. The nearly 100-m high pylon was made of reinforced concrete strengthened with a steel structure.