The project covered the execution of Phase 1 of construction work on S7 National Road from Elbląg to Olsztynek, section from Elblag to Kalsk. We have built civil engineering structures along and over the designed roadways (6 viaducts with lengths from 59 m to 105 m, 3 bridges with lengths from 12 m to 33 m and 2 underground pedestrian passes). We have built civil structures over the following railway lines: No. 204 Malbork-Braniewo (viaduct WD-18 with load carrying structure made of VFT girders, with total length of 138 m) and No. 220 Elbląg - Olsztyn (viaduct WD-24b with load carrying structure made of VFT girders, with total length of 70 m)

The contract was based on FIDIC.