As part of the project “Bridge rebuilding to ensure minimum clearance – road bridge at km 2.45 of the Warta River in Kostrzyn nad Odrą”, we have completed the extreme (flood) spans of the new structure and work is now underway on the construction of the river span using the cantilever method. We will soon be installing, among other things, the cable stays, i.e. suspending the superstructure, and in the near future - perform further stages of the road works related to the construction of bridge access roads.
As it is necessary to rebuild underground utilities and form and construct embankments and road surfaces, on February 24, 2025 (Monday) the traffic organization on the temporary bridge along Sikorskiego St. will change (km 107+005 to 107+180 of National Road No. 31). A speed limit of 30 km/h will be introduced and alternating traffic will be controlled manually from 6:00 a.m. to 10:00 p.m., and from 10:00 p.m. to 6:00 a.m. using traffic lights. Temporary traffic organization along that road section will be in effect until further notice. We ask the residents of Kostrzyn for their kind understanding and drivers to drive safely.